
What should you write down after a Rust wipe?
Write one entry for the wipe you actually performed. Keep it beside your owner notes with the server name, time, changed files or settings, and what a player verified. Include any important difference from the announcement.
Write the records you would want to find next week
Start with “Harbour, Friday 18:30 UTC map wipe. Started the new East Bay map. Map revision east-bay-v3.map. Previous world is in Thursday’s verified separate backup. Blueprints retained and Mei confirmed hers after opening.” Give your own entry a full date so you can match its time to logs.
Use an exact filename if there are multiple revisions. For a generated map, write the active seed and world size. Keep the source of any plugin changes in the same notes, such as the settings copy kept with the prior backup.
| Keep in one entry | Why you might need it later |
|---|---|
| Before and after map or seed | Identify the world before choosing any repair |
| Checkpoint location and recorded time | Find the real before-wipe copy |
| Player-side check and one unresolved detail | Know what someone verified and what to inspect next |
Close an open item deliberately
If the player report says the new map was correct but the shop rules were still untested, name who will check that and when. When they do, add the result to the same record. Ask the person covering the next shift to point to the correct backup and the change you still need to verify.